We spend most of our IFR lives wrapped in the warm cocoon of radar coverage, vectored from point to point by the all-seeing presence of ATC. And while controllers are human and occasionally make mistakes, the checks and safety nets in place rarely result in close calls, let alone bent metal. It’s also true that when clearances get tight in the final descent to the airport, responsibility is handed over to the pilot.
Except when it isn’t. Consider the LOC Rwy 6 to Shreveport, LA (KSHV) and the note “RADAR REQUIRED.” Requirements stated in the plan view and not the approach title mean the requirement is for something other than the final approach segment. Here radar can play at three different levels.
