Garmin GI 275 Added to Dassault Flight Deck Stand-By System
The display ‘seamlessly integrates’ with existing aircraft systems, offering the same functionality as the previous stand-by system, Dassault said.
The display ‘seamlessly integrates’ with existing aircraft systems, offering the same functionality as the previous stand-by system, Dassault said.
Construction is expected to begin in the second quarter of 2023, and the opening is set for late 2024.