Register

FAA Completes Nationwide ADS-B Network

Gemini Sparkle

Key Takeaways:

  • The FAA has completed construction of its nationwide network of over 600 ADS-B ground stations, a critical step for the NextGen air traffic control system, well ahead of the 2020 mandate.
  • This network allows controllers to continuously track equipped aircraft, including in remote or over-water areas beyond radar coverage, and provides pilots with traffic and weather data.
  • While controllers are already using ADS-B at some facilities, full implementation is expected by 2019, with a mandatory deadline of January 1, 2020, for all aircraft in controlled airspace to be equipped with ADS-B Out avionics.
See a mistake? Contact us.

Well ahead of the 2020 equipment mandate, the FAA says it has completed construction of a nationwide network of ADS-B ground stations, finishing installations of more than 600 special radio beacons from coast to coast — and beyond, in some cases — for the ongoing transition to the NextGen air traffic control system.

The ADS-B network of 634 towers enables controllers to track appropriately equipped aircraft continuously versus updates of nearly 5 seconds with radar technology. Controllers can also keep tabs on aircraft in remote regions such as mountains and over water in the Gulf of Mexico, where the sweep of radar isn’t available.

Ready to Sell Your Aircraft?

List your airplane on AircraftForSale.com and reach qualified buyers.

List Your Aircraft
AircraftForSale Logo | FLYING Logo
Pilot in aircraft
Sign-up for newsletters & special offers!

Get the latest stories & special offers delivered directly to your inbox.

SUBSCRIBE